CASE STUDIESBuild A Strong, Innovative Nation
See how our solutions stand tall behind millions of buildings in the U.S.
Case StudiesFrom challenges to solutions, discover the power of our approach
NEW HAVEN, CTPirelli Building Mixed Use Hotel
The iconic Marcel Breuer-designed Pirelli Tire Building at 500 Sargent Drive in the Long Wharf district of New Haven, Connecticut, is about to have new life breathed into it following 32 years of vacancy.
BETHESDA, MD7272 Wisconsin Avenue Mixed Use
In the heart of Bethesda at the prime intersection of Wisconsin Avenue and Elm Street, is one the most prominent development sites in Montgomery County, Maryland.
CLEVELAND HEIGHTS, OH12397 Cedar Road Mixed Use
Four-acre project site is located on Cedar Road and Euclid Heights Boulevard, just up the hill from University Circle in Cleveland Heights, Ohio.
INDIAN LAND, SCIndian Land High School
For this project, Telling manufactured all the Metal Framing including the Structural Load Bearing Studs & Track, Interior Non-Load Bearing 20EQ Drywall Studs & Track, Slotted Deflection Track, CRC Bracing, Flat Strap, and various Roll Formed Right Angles.
GRAPEVINE, TXThe Gaylord Texan Resort And Convention Center
$120 million expansion broke ground Sept. 8, 2016 and was completed in the second quarter of 2018 . Approx 800,000 lbs of metal manufactured by Telling Industries. It was completed in 2018.
BASKERVILLE, VIRGINIAMecklenburg Middle/High School
Telling Industries supplied the metal framing for the construction of the new Mecklenburg Middle/High School Complex for Mecklenburg County Public Schools at the corner of US-58 and Wooden Bridge Road in Baskerville, Virginia
GASTONIA, NORTH CAROLINACaromont Regional Medical Center
Part of CaroMont Health’s commitment to invest more than $300 million in new and expanded facilities in and around Gaston County over the next three years, CaroMont Regional Medical Center-Belmont is scheduled to open in mid-2023.
INSIDE THE PROCESSCapturing Moments in Time
Telling’s VersaDry System allows drywall to be installed 2 inches off the floor on a steel shelf. The shelf mitigates the wicking of water and eliminates the need for caulk resulting in cost and labor savings.